WE HAVE LONG-TERM EXPERIENCE
Our long-term experience will help you get the best solution and at the same time do it with high quality!
Projects
Warning: Undefined array key "leht" in /data01/virt84914/domeenid/www.elpec.ee/htdocs/wp-content/themes/elpec/references.php on line 71
Warning: Undefined array key "filter" in /data01/virt84914/domeenid/www.elpec.ee/htdocs/wp-content/themes/elpec/references.php on line 77
WE HAVE PROVEN OURSELVES WITH HUNDREDS OF SUCCESSFUL PROJECTS
Contact us
PREPARATION OF INTERNAL ELECTRICITY PROJECTS
Preparation of internal electricity projects for private houses, apartment buildings, special buildings, and warehouses from 2012
ELECTRICITY PROJECTS FOR CONNECTION TO THE DISTRIBUTION NETWORK
Preparation of more than 60 working projects for low and medium voltage (up to 35 kV) connection with building permits from 2006.
PLANNING OF POWER NETWORK
Planning and preparation of the terms of reference for more than 150 objects in both low and medium voltage networks since 2010.
DESIGN OF CUSTOMER MEDIUM VOLTAGE DISTRIBUTION SUBSTATION
Work design of the external switchgear and internal switchgear part of 110/6 kV power transformer. Design of distribution network assemblies with both internal and/or external distribution. 7 work projects with voltage 0.4/6 kV, 0.4/10 kV, 0.4/35 kV all over Estonia since 2012.
PREPARATION OF TENDERING DOCUMENTATION, TECHNICAL SOLUTION, AND DRAWINGS
Medium voltage up to 35 kV substations in Estonia for 15 objects from 2012.
MAINTENANCE OF ELECTRICAL INSTALLATIONS AT NOMINAL VOLTAGE UP TO 15 KV
Maintenance and repair of 10/0.4 kV and 15/0.4 kV substations, more than 100 objects from 2009. Maintenance and repair of 10-15 kV lines, more than 100 objects from 2009. Maintenance and repair of 0.4 kV lines, more than 100 objects since 2009.
CONSTRUCTION OF ELECTRICAL INSTALLATIONS AT NOMINAL VOLTAGE UP TO 15 KV
Construction of 10/0.4 kV and 15/0.4 kV substations, more than ten objects from 2009. Construction of 10-15 kV overhead and cable lines, more than ten objects from 2009. Construction of 0.4 kV overhead and cable lines, more than 100 objects since 2009.
OPERATION OF DIESEL POWER PLANTS
Operation, maintenance, and preparation of operating instructions for 10/0.4 kV diesel power plants (400 kW), two objects from 2015.
MICRO - PRODUCTION OF ELECTRICITY, SOLAR ENERGY SYSTEMS
design, construction, and installation